Factory direct5,000 m² in GuzhenMixed containersUL / ETL · CE

Wholesale Christmas lights, priced from the factory floor

Most "wholesale" lists are a trading company reselling a factory price with a margin built in. We are the factory: 5,000 m² in Guzhen, Zhongshan, LED assembly and frame bending in house, 48-hour burn-in before packing. This page is the commercial side — what the minimums actually are per product line, what moves the price, what lands at your door, and what paperwork arrives with the container.

See MOQ by product line
Who buys from this page

Four buyers, four different orders

"Wholesale" covers four commercial relationships that look similar from the outside and are costed completely differently. Find yours in the table — the minimums, the paperwork and the loading plan all follow from it.

BuyerHow they sellWhat they orderWhat decides the order
Importer / distributorHolds stock and sells to retailers, garden centres and e-commerceVolume lines by the container: C7/C9 strings, mini lights, rope and curtainRepeatable batch colour, load plans that fill a 40 HQ, a price that holds for the season
Retail chain buyerBuys against planograms for Q4 shelvesRetail-ready SKUs with barcode, hang tag and a master carton that fits a DCPackaging compliance, on-shelf date reliability, test reports on file before the buy meeting
Brand owner / private labelSells under its own name, no factory of its ownOwn cable print, connector mould, carton and manualA supplier that will not run your tooling for a competitor, and MOQ you can live with
Project contractorMunicipal, mall, casino, resort, event and theme-park workMotifs, giant trees, sculptures, street and pole lights, one-off engineered piecesRender before deposit, wind and IP engineering, staged delivery to the install window
Minimums

What the minimum really is, line by line

Ask for one MOQ number and you will get one number that is wrong for nine of the ten things you want to buy. The minimum is set by what the line has to purchase — a wire spool, an LED bin, a bending fixture — not by a sales policy. So we publish two numbers: what a production run needs, and what a first order can actually start at.

Product lineProduction minimumTrial order fromWhy that is the number
Commercial string lights (C7 / C9, HT21)50 sets per colour—50 sets covers one wire spool and one LED bin run — the production minimum is already the trial level
Rope, neon and strip100–500 m per specification30 mReel length, jacket colour and PCB width are each a separate purchase minimum
Curtain and icicle50 sets per size—50 sets covers one controller batch and the cut-length setup
Net and meteor50 pcs nets / 50 sets meteor—Moulding batch for the connector and drop spacing
Motif and 2D displays1 pc per design—Custom-made to your requirements; the bending fixture is priced into the unit
3D sculptures and characters1 pc per design—Custom-made to your requirements; tooling and hand-wiring are priced into the unit
LED trees (cherry, palm, maple, willow)5–10 pcs2 pcsTrunk and branch assembly is bench work, not a line
Giant commercial trees, 3–30 m1 unit1 unitEngineered to your site: base, wind load and access decide the build
Street and pole lights20–50 pcs, or per project5 pcsBracket tooling is specific to the pole diameter and mounting pattern
Mall and turnkey installations1 project1 projectQuoted from your drawing, not from a catalogue

A trial order is a real order, not a sample: production quantities at a higher unit price, existing colour and specification only, and it queues behind production runs. That is the honest trade — you test the product and our paperwork on a small order, and we do not pretend a 50-set run costs the same per set as a 2,000-set run. Both prices appear in the same quote so you can see what the step up is worth. The fastest way to lower a production minimum is to reduce the customisation: a catalogue snowflake in our warm white ships at sample quantity, the same snowflake in your brand white on black cable with a custom bracket cannot.

Quote anatomy

Our quotation, line by line — and what to check on each one

We do not publish a price list, and it is not a delaying tactic. Conductor gauge, LED bin and jacket compound move the unit price more than most buyers expect — two customers ordering the same model can sit 20–30% apart. What we publish instead is the structure, because a one-number quotation hides four decisions. Ours is itemised, and this is the list in the order it appears — with the question worth asking on every line before you sign it.

Line on the quotationWhat it statesWhat to check before you sign
Product specificationConductor cross-section, LED type and bin, IP rating, run length, plug standardThat the conductor and the IP rating are the ones you asked for. Those two lines decide whether the product survives the season; every other line is comfort.
Tooling and platesItemised as a one-time line, with the fixture, mould or print plate namedWhether the tooling is billed once and belongs to you, or amortised into the unit price. It changes the price you pay on the reorder.
PackagingBag, carton, colour box, artwork, plate cost and the print runThe minimum per SKU and whether artwork revisions are billed. This is where a retail-ready project quietly doubles its launch cost.
Certification and testingThe reports the line already holds, and the ones that must be commissionedWhether UL component sourcing sits inside the quoted lead time or after it. Ask directly — it is a common gap between the price and the promise.
Sample and courierSample price, courier account, and the credit note against the production orderThat the credit is written on the quotation. A verbal credit is not a credit.
Unit price and tier breaksPrice at your quantity, plus the next two quantity breaksWhat quantity moves you to the next tier. It is often lower than buyers assume — a small top-up can reprice the whole order.
Freight and termsFOB / CIF / CFR / DDP, currency, rate basis, and the validity dateThe validity window. Anything quoted beyond 30 days in a copper market is a re-quote waiting to happen.
Lead timeSplit into sampling, production and transit — never one numberWhich of the three you can compress and which you cannot. Production is rarely the part that slips; the missing test report usually is.

For the underlying cost drivers — copper weight, LED bin, season timing and how to compare three quotes side by side — see the wholesale price guide.

Landed cost

Why the factory price is not the price you pay

An ex-works factory price and a landed cost per set are two different numbers, and the difference is usually larger than the margin you are negotiating over. Build the landed figure before you pick a supplier, or you will optimise the smallest line in the quote.

Landed = factory price + inland haulage + ocean freight and insurance + duty + port, clearance and inland haulage + the cost of the money tied up in stock.

On a low-value set, freight and duty can be a third of the landed number, and packaging is what you are paying freight on — a colour box that adds 4% to the factory price can add more than 4% to the freight, because you are shipping air. That is why we quote a loading plan with the price: cubic metres per 1,000 sets, cartons per pallet, and the fill rate of the container you are actually booking.

Our quotations are EXW (ex-works) our Zhongshan factory. We can arrange shipping on your behalf — sea, air or courier, to your port or to your door — with freight and destination charges added at cost. If you have a forwarder, send the rate card and we will cost against your lane rather than ours.

Private label

Your brand, from the cable print to the master carton

Private label is not a sticker on a neutral box. It is cable print, connector mould, carton, manual, barcode and hang tag — and each one has its own minimum, because each one is a plate, a mould or a print run.

LevelWhat is includedTypical minimumBest for
Poly bag + neutral cartonPlain bag with a suffocation warning, brown or white carton, shipping mark as you specifyAny quantityImporters who repack, or ship straight to a 3PL
Printed carton, your brandOne or two-colour flexo, product photo, barcode, country of origin, warning text500 pcs per SKUDistributors selling to trade counters
Retail-ready colour boxColour box, hang tag or euro hole, inner tray, barcode, multi-language text1,000 pcs per SKURetail chains, garden centres, gift channels
Marketplace-readyFNSKU or retailer label applied, sealed bag, carton weight and size within the platform limit300 pcs per SKUSellers shipping into Amazon or a similar fulfilment network

Minimums are typical and per SKU; a mixed order that reaches them across three lines is still a mixed order. Packaging design is done in house from your vector logo — no separate agency invoice.

Market access

What each destination actually requires

Certification is the line item buyers most often discover too late — after the container is booked and the retail customer asks for the test report. Here is what each market needs and what lands in your inbox with the documents.

MarketRequired on the productWhat we supply
United StatesUL or ETL listed components, FCC Part 15 for controllers and remotes, Prop 65 labelling where applicableComponent certificates, FCC test report, third-party lab reports, DoC
CanadacUL or CSA listed components, ISED for wireless controlsComponent certificates, ISED test report
European UnionCE under LVD 2014/35/EU and EMC 2014/30/EU, RoHS 2011/65/EU, REACH; WEEE registration sits with the importerDeclaration of Conformity, RoHS and REACH reports, test reports, WEEE guidance
United KingdomUKCA marking; CE continues to be accepted for most electrical goods in Great Britain — confirm the current position with your compliance providerUKCA DoC, the same test reports as the EU file
Australia / New ZealandRCM marking, AS/NZS 60598 series, IP evidence for outdoor useRCM DoC, IP test report, AS/NZS test report

Registration duties that sit with the importer — WEEE, packaging EPR, and the US importer of record — stay with you. We supply the technical file those registrations depend on.

Quality

What a factory floor buys you that a trading desk cannot

  • Incoming inspection on wire, LEDs, drivers and controllers — rejected at the gate, not on the line
  • 48-hour burn-in on every batch before packing, with a root-cause report on any failure
  • Waterproofing checked at the joint, which is where outdoor failures actually start
  • Outgoing inspection to AQL 2.5, or to your tighter standard if you have one
  • Third-party inspection welcome — we book the access and hold the container for it
  • Batch and lot number recorded against your account, so a reorder matches the previous run
  • Photographs and a loading video before the container leaves the yard
  • One account manager across sampling, production and shipping — not a handoff per stage
Trial order?

Start with one mixed pallet, inspect it yourself, then talk about a season programme. The sample fee is credited against your first production order — in full once that order reaches the volume we agree with you at quotation.

Ask about a trial order
Motif and 3D light display production for wholesale orders
48 hburn-in on every batch before packing
Trade terms

How the commercial side is written down

IncotermsEXW our Zhongshan factory as standard; we can arrange sea, air or courier freight to your port or door on request, at cost
Payment30% deposit with the order and 70% balance before loading; T/T, LC at sight, or Trade Assurance for a first order
QuotationItemised quotation, render for custom pieces and a loading plan within 12 working hours of a complete brief
Sampling1–10 pcs at sample pricing by courier. The sample fee is credited in full against a first production order once it reaches the volume agreed with you at quotation; below that volume, the credit is discussed case by case.
Production15–20 days for catalogue runs; tooling, UL sourcing or peak-season programmes are quoted with a confirmed date
DocumentsCommercial invoice, packing list, bill of lading, certificate of origin, test reports and the DoC for your market
CurrencyUSD as standard, EUR or GBP on request; the rate is fixed at PI signature
InspectionYour own third-party inspection is welcome at any point — SGS, TÜV, Bureau Veritas, Intertek or QIMA — at AQL II, normally 2-3 working days after booking. We hold the container until it clears
Quotation

What to send so the first quote is usable

A quotation built on these ten answers is accurate the first time. Missing four of them is why a wholesale quote takes a week and still needs revising.

  • The product lines and the quantity per line — a photo or a link is enough to start
  • Your market and the marks you need on the product and the carton
  • Voltage and plug standard: 120 V US / 230 V EU / 220–240 V AU
  • Colour temperature and whether the white must match an earlier shipment
  • Packaging level: poly bag, neutral carton, printed carton or retail-ready
  • Whether your brand goes on the cable, the connector, the carton, or all three
  • The date the goods must be in your warehouse, not the date you want to order
  • Your target landed cost, if you have one — it tells us which levers to pull first
  • Any test report or certificate your customer has already asked you for
  • Whether this is a trial order or the first of a seasonal programme
Before you commit

Three questions that separate factories from resellers

Who owns the production line? Ask for a video walk-through of the LED assembly and burn-in area, dated. A trading company will send you a catalogue; a factory will send you the floor.

What is the failure rate on the last three batches? A supplier who says "zero" is not measuring. A supplier who sends a number and a root-cause note is running a process you can rely on.

Can I see the lot number on my own shipment? If the batch record is not traceable to your order, next season's reorder will not match this season's colour — and you will find out in a photograph from a customer, in December.

FAQ

Questions wholesale buyers ask us

What is your minimum order for wholesale Christmas lights?
It depends on the line, because the minimum is set by the raw material, not by policy: 50 sets per colour on commercial string lights, 100–500 m on rope and strip, and a single piece per design on motifs, sculptures and characters — every one of them custom-made to your requirements, so one unit is a complete order. A giant tree is engineered to site and quoted per unit. A mixed order across lines is normal and is how most first containers are built.
Can I mix product lines in one container?
Yes, and for a first order it is usually the right call. A mixed container costs a little in loading efficiency — you lose some cubic metres to carton shapes that do not nest — and it saves you from committing a full container to a single SKU you have not sold yet. Send the line list and we will return a loading plan with the fill rate.
Are you a factory or a trading company?
A factory. LED assembly, frame bending, wiring and burn-in happen on our own floor in Guzhen, Zhongshan — 5,000 m², and visits are welcome. We buy LEDs, wire and drivers from upstream suppliers like every manufacturer does; what we do not do is add a trading margin between you and the production line.
Will you be the cheapest quote I receive?
Probably not, and you should be suspicious of the one that is. A quote can be lower because the conductor is a gauge thinner, the LED bin is unmatched, the jacket is standard PVC instead of cold-flex, or the certification is a photocopy of someone else's. Compare cost per season and cost per claim, not cost per set.
How do you handle quality control?
Incoming inspection on wire, LEDs and drivers; in-process checks on polarity, solder and waterproofing at the joint; and a 48-hour burn-in on every batch before packing, with failures triggering a root-cause report rather than a silent rework. Outgoing inspection runs to AQL 2.5 unless your standard is tighter, and your own third-party inspector is welcome.
Can you put my brand on the product and the packaging?
Yes — cable print, connector mould, carton, manual, barcode and hang tag can all carry your brand, and retail-ready packaging is designed in house. Printed cartons start at 500 pcs per SKU, retail-ready colour boxes at 1,000 pcs per SKU, because both are a plate and a print run.
What documentation comes with the shipment?
Commercial invoice, packing list, bill of lading, certificate of origin, the test reports for the line you bought, and a Declaration of Conformity for the market you are selling into. If a retail customer has asked you for something specific, tell us at quotation stage — it is far cheaper to test for it before production than to chase it after.
We also install, not just resell — is there a separate programme?
Yes. Install crews buying seasonal stock by the pallet are covered on the installer trade page, which goes deeper on truck stock ratios, batch colour continuity and mid-season spares. This page is the container-level commercial side; both run off the same production lines and the same account manager.
Next step

Send the line list, get a costed container

Line items, quantities and destination market — that is enough for an itemised quotation, a loading plan and the compliance file for your market, within 12 working hours.