Trade onlyBatch-matched colour48 h burn-inSpares held 12 months

Christmas light installers: buy once in July, match it for five seasons

If you install rooflines for a living, you are not the customer the retail shelf is built for. You buy by the pallet, in July, and what actually costs you money is not the price per set — it is a batch that arrives three shades off last year's white, a socket that fails in a January freeze, and a supplier who has no spares in week three of the season. We build for that customer.

See a truck stock list
Who this page is for

We supply the crew, not the homeowner

Yuneng is a commercial Christmas lighting factory in Guzhen, Zhongshan. Our customers on this page are installation companies — one truck or forty — plus the landscape firms, roofers and event crews who add lighting to the services they already sell. You buy in pallets, you install in October, you service in December.

We are a manufacturer, not an installation company. If you are a homeowner looking for someone to put lights on your house, a local installer is what you need — we sell to the people who do that work.

Warm white installer-grade LED string lights on a roofline
98%on-time delivery across 1,200+ containers
Retail shelf vs installer stock

Why the cheap set costs you a second visit

The difference between a $12 retail set and installer-grade stock is not brightness. It is whether the product survives a teardown, a storage tote and a January freeze — and whether you can service it instead of replacing it.

SpecificationRetail setInstaller-grade stockWhat it changes on site
Conductor22–24 AWG, thin and stiff in cold20 AWG copper on the run, 18 AWG on commercial lengthsCold snaps do not embrittle the wire; voltage holds to the end of the run
SocketsMoulded into the wire, no service accessSealed sockets with replaceable lamps and spare fuses in the boxOne failed lamp is a 40-second swap on the ladder, not a dead 100 ft run
Cable jacketStandard PVC, stiffens below 0 °CCold-flex compound rated to −30 °C, UV-stabilisedInstall in October in Minnesota without cracking the insulation
ConnectorsTwo-pin push-in, no lockLocking, stackable end connectors with a sealing collarRuns join and re-join across seasons without water tracking in
ColourWhatever bin the line is runningBatch-binned warm white, lot number recorded per shipmentYear-two additions match year-one installs instead of reading pink next to them
LifeOne to two seasons before the set is scrapThree to five seasons, with spare parts availableYour cost per install drops every year you keep using the same stock
Planning

A two-crew truck stock, item by item

Starting quantities for a crew running roughly 60–80 residential installs a season. Scale linearly; the ratio between lines is what matters, and it is the ratio most first-season buyers get wrong.

ItemSeason quantityWhy it belongs in the order
C9 warm white, 100 ft runs30–40 runsMain roofline product; the volume line in most crews
C7 warm white, 100 ft runs15–20 runsDetail work, wreaths, smaller gables
Mini strings, 100 ft, warm white and multi40–60 setsTrees, shrubs, railings, fill-in work
Extension cords, 25 ft and 50 ft40–60 pcsEvery job needs more than the plan says
Roofline clips and gutter clips500–1,000 pcsConsumable; never buy per job
Timers and photocells20–30 pcsSold as an upsell, kept as a service part
Spare lamps and fuses1 kit per 10 runsTurns a call-back into a two-minute stop
Storage totes and cable tiesby siteEnd-of-season teardown packing

Quantities are a starting template, not a rule — send your last season's install count and we size the order against it.

Season calendar

The buying calendar, in the order it actually happens

Buyers who order in October are buying air freight and hoping. The calendar below is the one our installer customers run — it is why July is our busiest quotation month and why the price and capacity you lock in spring is the price you get in autumn.

MonthWhat you doWhat we do
January – MarchReview the season: failure rate by SKU, colour complaints, spares usedPlace the season contract and lock price and capacity
April – JuneQuote commercial and HOA work off confirmed stockConfirm quantities, artwork and packaging; pay deposit
July – AugustProduction runs on your approved batchGoods leave the factory; sea freight books before the October rush
SeptemberStock lands and is checked against the lot numbersTop up short SKUs while air freight is still an option
October – NovemberInstall peakEmergency spares ship by air within 48 hours of a confirmed claim
December – JanuaryService calls and teardownLog failures now — they set next season's spec changes
Support

What a factory does that a trading company cannot

  • LED production in house — bins recorded, so a reorder matches the previous season
  • 48-hour burn-in on every batch before packing; failures trigger a root-cause report
  • Spare lengths and lamp kits held 12 months after your shipment date
  • Emergency air replacement within 48 hours of a confirmed failure, mid-season
  • Neutral, private-label or retail-ready packaging, designed in house
  • Delivered to your warehouse, your 3PL, or split to a job site
  • Technical sheets, load calculations and IP documentation you can forward to a client
  • One account manager for the season, on WhatsApp during install weeks
Season contract?

Volume held against a signed PI, price locked, delivery scheduled to your install window — not to our production convenience.

Talk to us about a season contract
Installer-grade pure white string lights packed for wholesale
Trade terms

How the commercial side works

Minimum order50 sets per SKU per colour for a production run, mixable across the range within one order — the 50-set minimum is already a trial-sized commitment
Price tiersTier 1 at 50–499 sets per SKU · Tier 2 from 500 sets per SKU · Tier 3 season contract with volume held for you
SamplesSample fee credited in full against a first production order at the volume agreed at quotation; below that volume, the credit is agreed case by case
Payment30% deposit, 70% balance before loading; T/T, LC at sight, Trade Assurance
Lead time15–20 days production (peak season or complex briefs quoted separately), 30–38 days ocean to US East or West Coast, 5–7 days air
PackingNeutral cartons, your own printed carton, or retail-ready with barcode and hang tag
DeliveryEXW Zhongshan as standard — we can arrange freight to your warehouse or 3PL in the US on request, at cost
SparesReplacement lengths and lamp kits held for 12 months after the shipment date
Quotation

What to send for a trade quote

A quote with these ten answers is accurate the first time. Missing four of them is why trade quotations take a week.

  • How many crews you run and the install window you work to
  • Roofline metres you installed last season, by product type
  • The white you are selling — warm white, pure white, or both, and the Kelvin if you know it
  • Voltage and plug standard on site (120 V US / 230 V EU)
  • Whether you resell to homeowners, HOAs, or commercial properties
  • Packaging: neutral, your printed carton, or retail-ready with barcode
  • Which consumables you want on the same order — clips, cords, timers, spare lamps
  • Your failure points last season — what broke, on which SKU, in which month
  • Where the goods should land: your warehouse, a 3PL, or direct to a job site
  • The month you need stock in hand, not the month you want to order
Before you buy

Three numbers worth checking on any supplier

Cost per install, not cost per set. Divide the price by the seasons the product lasts and add the cost of a call-back. A set that survives five seasons at twice the price is cheaper than a set you replace every year.

Spares availability in week three. Ask what happens on 12 December when a run fails. If the answer is a credit note, you are carrying the risk.

Colour continuity. Ask for the bin and lot number in writing. If a supplier cannot tell you which bin your order was built from, next season will not match this one.

FAQ

Questions installation companies ask us

Do you sell to individual installers or only to distributors?
Both. A one-truck installer on a 50-set first order or a 2,000-set seasonal programme gets the same catalogue and the same batch-matched colour as a distributor buying a container; only the price tier changes. We do not sell single retail sets — the smallest unit we ship is a full carton.
Can you deliver straight to a job site or a 3PL?
Yes. We ship to your warehouse, to a US 3PL for fulfilment, or — for larger commercial installs — split the container and deliver to site. Tell us at quotation stage, because it changes the carton marking and the loading plan.
Will next season's warm white match this season's?
That is the main reason installers move from retail sets to a factory. We record the LED bin and the jacket lot for every shipment and hold them against your account, so a reorder in the following season is built to the same bin rather than to whatever the line is running that day.
What happens if a run fails mid-season?
Confirmed failures are replaced by air within 48 hours — lengths, not credit notes — because a credit note does not finish the install. This is why we hold spare lengths for 12 months after the shipment date and why every carton carries spare lamps and fuses.
Do you supply clips, cords, timers and other consumables?
Yes, and most installers consolidate them onto the same order to avoid a second freight charge. They are not the margin line — they are the reason a crew does not lose a day driving to a hardware store in December.
Is there a difference between your installer stock and the retail sets on Amazon?
Yes: conductor gauge, socket construction, cold-flex jacket, locking connectors and batch-binned colour. A retail set is engineered to hit a shelf price; installer stock is engineered to survive five teardown cycles and to be serviced rather than replaced.
Can we put our own brand on the product and packaging?
Yes. Cable print, connector mould, carton, manual, barcode and hang tag can all carry your brand; retail-ready packaging design is done in house. Minimum for printed cartons is 500 units per SKU.
We also install permanent lighting — can you supply both?
Yes, and they are separate product lines. Seasonal stock is what this page covers; the year-round track systems — 24 V engines, joints, drivers and controls — are on the permanent lighting page. Crews that run both usually order the seasonal stock in July and the permanent hardware as projects are sold.
Next step

Tell us the season, we will cost the pallet

Send your last season's install count and the lines you run. You get a costed truck stock list, batch-matched colour confirmation and a delivery schedule that lands before your install window, within 12 working hours.